1a - Applications Audit
Contractor: axess lab
Main Contact: Eric Eggert – Principal Accessibility Specialist
Start date: 1 July 2026
End data: 31 August 2026
Abstract
This is the foundation milestone of the entire programme. Its outputs will define the evidence base, test protocols, and acceptance criteria that all subsequent milestones depend on. The contractor for this milestone must be an independent external accessibility specialist with no prior vested interest in Joomla's current conformance claims.
Joomla currently aims for WCAG 2.1 AA conformance since Joomla 4, but this has never been independently validated. WCAG 2.2 introduces additional success criteria not yet fully addressed.
Scope of Work
Deliverable 1: Expert WCAG 2.2 AA Audit
Commission and complete an expert manual and automated, but not AI based WCAG 2.2 AA and ATAG audit of Joomla's admin interface (Atum template) and default frontend template (Cassiopeia)
including but not limited to:
- Navigation and landmark structure
- Editor, Forms and form controls
- Dialogs and modal interactions
- Tables and data presentation
- Media manager
- Installer and update flows
- Authentication
All findings must be categorised by severity (critical, major, or minor) and mapped to the relevant WCAG 2.2 success criteria.
Deliverable 2: Baseline Metrics
Establish quantifiable, repeatable measurements of Joomla's current accessibility state, including:
- Automated violation count from axe-core scans of core admin views
- Task-completion benchmarks for key user journeys using assistive technologies (see Browser Matrix for details)
Metrics documented in a format that can be re-run identically at project close, to allow direct before-and-after comparison for STF reporting.
Deliverable 3: Accessibility Test Protocols and Acceptance Criteria
Define the test protocols and acceptance criteria to be used across all subsequent milestones, including:
- Which assistive technology and browser combinations are in scope
- Pass and fail thresholds
- Regression test approach
Minimum AT/browser matrix: (see Browser Matrix for details)
Deliverable 4: Public Publication of Audit Report and Baseline Metrics
Deliver the full audit report and baseline metrics before the remediation plan is drafted in Milestone 1b.
Deliverable 5: Documentation and Milestone Report
Establish the programme documentation framework and produce the milestone completion report in the format agreed with OSM at kick-off.
Desktop:
- NVDA + Chrome and Firefox (may be tested as a combined pass)
- JAWS + Edge
- VoiceOver + Safari (macOS)
Mobile (minimum one combination):
- VoiceOver + Safari (iOS) or TalkBack + Chrome (Android)